Skip to contentSkip to footer

Homes & businesses

Electrical Panel Upgrades in Monroe & Snohomish County, WA

More capacity for a heat pump, EV charger or remodel, or a new panel in an older home, with the load checked first, the permit handled and your utility lined up.
A Beaver's Plumbing van parked in front of a craftsman home as a technician walks up to the door

Pricing: Free estimate, upfront flat-rate price.

Key facts

Pricing
Free estimate, upfront flat-rate price
Typical service
100 amp in older homes, 150–200 amp in newer
Permit
Required, with an inspection
Your utility
Has to disconnect and reconnect: plan ahead

What's included

Our panel upgrade service.

  • A load calculation, to see whether you need an upgrade at all
  • Main panel replacement and service upgrades
  • Meter base and mast work
  • Subpanels for shops, garages, additions and ADUs
  • Replacing older or damaged panels
  • Surge protection at the panel
  • Permit, inspection and coordination with your utility

Our process

How it works.

  1. 01

    Check the load

    We add up what's on the panel now and what you want to add. If it fits, we'll tell you and quote the circuit instead.

  2. 02

    Flat price and permit

    You approve a written price, including what your utility will charge if we know it, and we pull the permit.

  3. 03

    Line up the utility

    The power has to be cut at the meter, so the utility's disconnect and reconnect set the schedule.

  4. 04

    Install, inspect, energize

    We swap the panel, label the circuits, and get it inspected and turned back on.

Why it matters

Done right, the first time.

Room for what's next

Heat pumps, EV chargers and tankless water heaters all want capacity. Planning for them now means doing this once.

No upgrade you don't need

A load calculation comes first. If a new circuit fits on your panel, that's what we'll quote.

Handled end to end

Permit, inspection and the utility's part of the job are on our list, not yours.

Done to code

Permitted, inspected work protects your home, your insurance and your resale.

Do you need a panel upgrade for a heat pump or EV charger?

Not always. If what's on your panel now plus the new load fits its rating, you don't need one. The National Electrical Code's minimum is 100 amps, which is common in older homes, while newer homes usually have 150 to 200. Berkeley Lab found that homes built before 1960 or under 1,000 square feet are much more likely to have 100-amp service, and that Level 2 EV charging on those panels more often needs load management or an upgrade.

So we run the numbers before we quote. Sometimes a load-sharing device or a smaller charger setting does the job for far less than a new service.

What your utility has to do

Snohomish County PUD: a service change starts with its New Service Questionnaire, and disconnects and reconnects are scheduled through the PUD. Raising panel capacity brings a meter and transformer fee and an increased wire fee. The PUD says rewires and panel upgrades may take up to 12 weeks, with fees usually prepaid, so call before your project has a deadline.

Puget Sound Energy: Customer Construction Services (1-888-321-7779) asks for at least five business days' notice to disconnect or reconnect, and charges based on labor and crew size. You own the meter base and mast, and the permit must be on site. Washington law says to get the work inspected and approved before the utility connects, though a utility can reconnect an increased or relocated service earlier, at its discretion, when a permit is displayed.

Older panels

Federal Pacific Stab-Lok and Zinsco panels often come up in home inspections. The U.S. Consumer Product Safety Commission investigated Federal Pacific breakers and closed the case in 1983 without making a determination on safety, though its testing confirmed failures on certain UL tests. We found no recall of either brand. If you have one, have an electrician look at it and decide from what's actually there, and we'll tell you honestly what we find.

Rebates and credits (checked November 2026)

The federal 25C credit, which covered panels, is gone for property placed in service after December 31, 2025, and federal home energy rebates haven't launched in Washington. The state's HEAR program, run by local administrators for households up to 150% of area median income, can cover panel and wiring upgrades needed for new electric equipment. Availability depends on where you live: Snohomish County PUD says it didn't receive an award this round.

Pricing

What do panel upgrades cost?

Every home and every job is different, so we price each one after a look. Request a free estimate: we'll reach out, see what's going on and give you a written flat-rate price before any work begins.

What affects the price

  • Panel size and how many circuits move over
  • Whether the meter base, mast or service wires need replacing
  • Panel location and access
  • Code updates that come with the new panel, such as surge protection
  • Permit and utility fees
  • Upgrades above 200 amps, which may need trenching and new conduit

Members pay less: the Dam Good Defenders Club waives dispatch fees. See membership

Good questions

Panel upgrades FAQ.

Don't see your question? Call or text (425) 845-3535. A real person answers, 24/7.

How much does a panel upgrade cost?

It depends on the size, how many circuits move over, whether the meter base or service wires need replacing, and your utility's fees. Request a free estimate and we'll give you a written flat-rate price before any work begins.

How long does a panel upgrade take?

The electrical work is usually about a day. The wait is mostly on the permit and the utility: Snohomish County PUD says rewires and panel upgrades may take up to 12 weeks, and PSE asks for at least five business days' notice for a disconnect or reconnect.

What size panel do I need?

It depends on what's on it now and what you plan to add. The code minimum is 100 amps, and newer homes usually have 150 to 200. Adding a heat pump, EV charger and electric water heater to a small service is what usually tips it. A load calculation answers this before you spend anything.

Is my Federal Pacific or Zinsco panel dangerous?

Nobody can honestly say from the brand alone. The CPSC closed its Federal Pacific investigation in 1983 without making a safety determination, and we found no recall of either brand. Have an electrician evaluate yours, especially if breakers aren't tripping as they should or the panel shows heat damage.

Does a panel upgrade need a permit?

Yes. L&I names panelboards, meter bases and masts among the work that needs a permit and an inspection. L&I issues them in most places, and some cities, including Everett, Lynnwood, Marysville and Mountlake Terrace, run their own. It's part of the job.

Service areas

Panel upgrades near you.

Our shop is in Monroe, so the Skykomish valley, Snohomish County and north and east King County get our fastest response. We also schedule Skagit, Whatcom, Pierce and Thurston County work around drive time.
All service areas

Plumbing problem? Let's fix it right.

Free estimates, upfront flat-rate pricing, and a 24/7 emergency line at (425) 845-3535.

Call TextFree estimate